Prima Strategic Group  team all together has over 100 years of experience in executing and managing Major Capital Projects, Managing Supplier Quality Management, Supplier Capability Evaluations, Third Party Inspection, Energy Audits, Management System Audits, Design Verification, Project Monitoring and Evaluations, Training and Knowledge Management. Some of the Experience details are shown below:

 Project Quality Management
  1. GCGV – Infrastructure Project–2016 – Current
  2. Business Consulting (Oct 2016)
  3. Business Consulting (Aug –Sept 2016)
  4. Business Consulting (Aug –Sept 2016)
  5. Ubon Development Project (2013-2016)
  6. GVLA Development Project (2011-2012)
  7. Angola LNG Project (2007-2011)
  8. Gorgon LNG Project (2013-2014)
  9. Wheatstone LNG Project (2012-2014)
  10. Nexen Petroleum USA (2004 – 2005)
  11. Sempra Energy LNG Project at KBR Inc. Houston (2004 – 2005)
  12. KBR Inc. Houston (2005 – 2007)
  13. Malampaya Platform Development Project
  14. KBR Singapore & Manila (2003 – 2004)
  15. Malampaya Platform Development Project
  16. KBR Singapore & Manila (2003 – 2004)
  17. Shell – BLNG MCHE EPC Installation Project 2003 – 2004
  18. Belanak FPSO Field Development Project for ConocoPhillips by KBR Singapore (2002 – 2003)
  19. Gujarat Water Supply & Sewerage Board(GWSSB) (1999-2001)
  20. Reliance Ports & Terminals Ltd., Jamnagar, Gujarat, India (2000 – 2001)
  21. Petrochemical Complex at Haldia, West Bengal, India.(1998 – 2000)
  22. UOP Technology based PSA H2 Plants for Clients (1993-1996)
  23. Construction of Power Plants and Caustic & H2S Storage Tanks for Various Clients (1991-1993)A. 500X2 MW Thermal Power Plant at Ropar, Punjab  B. 3x25MW FBC Power Plant at GRASIM Industries Ltd, C. Nagda Coal and Ash Handling Plant at Energy Centre-II, Nagda, India  D. 25 MW Thermal Power Station at Nagda, E. India Caustic Soda and H2S Tankages Project, Nagda, India
 Energy  Management Audit
DATES CONTACT DETAILS OF THE COMPANY AUDITED
12-Sep-97 Mansurpur Sugar Mills Ltd., Mansurpur, Meerut (U.P.), India
30-Dec-97 Energy Conservation & Management Study at JCT Ltd., Bhagwara (Punjab), India
18-Jun-96 Indian Telephone Industries Ltd., Rae Bareli (UP), India
18-Jun-96 Road Master Industries Cycles Limited, Rajpura (Punjab), India
19-Jun-96 Mansurpur Sugar Mills Ltd., Mansurpur, Meerut (U.P.), India
19-Jun-95 Majestic Auto Ltd., Ludhiana (Punjab), India
1998 Seth Industrial Corporation, Ludhiana (Punjab), India
1997 Jain Steels Industries Ltd., Mandi Govind Garh (Punjab), India
12-Sep-97 Mansurpur Sugar Mills Ltd., Mansurpur, Meerut (U.P.), India
Management System Audits

Performed extensive Management System Audits across the industries, amounting over 150 days and over 55 facilities including Heavy Fabrication Yards, EPC Organizations, Construction Sites, Owner & Operator Organizations and Suppliers across the world. Capability Evaluation and conformance to ISO 9001, ISO 14001, OHSAS 18001, API Q1 and API Q2 have been the primary standards and focus areas.

Specification Development

For Facilities and Capital Projects

  1. Quality Management System Specifications for Major Capital Projects
  2. General Quality Assurance Requirements for Small Capital Projects
  3. Quality Assurance Requirements for Equipment and Material Manufacturers
  4. General Q requirements for Subsea Equipment
  5. Requirements for Manufacturer’s Quality Data Books
  6. Requirements for Control and Reporting of Non-Conforming Product
  7. Purchasing Quality Requirements for Supplying Materials from other than Original Manufacturers (Stokists)
  8. Quality and Inspection Requirements for Pressure Castings
  9. Quality and Inspection Requirements for Welding of Process Piping at Site
  10. Tracking & Reporting of Welding, NDT and Pressure Testing
  11. Qualification, Testing and Performance Monitoring of NDE Personnel.
  12. Asset Integrity and Baseline Inspection Requirements for New Construction

Drilling and Completions

  1. General Quality Requirements for Drilling and Completions
  2. Purchasing Requirements for Oil Country Tubular Goods (OCTG)
  3. Purchasing Requirements for Steel Casing & Tubing
  4. Purchasing Requirements for Downhole Equipment
  5. Purchasing Requirements for Wireline Surface Equipment
  6. Purchasing Requirements for Wellhead & Christmas Tree Equipment of Standard Wells

Criticality Based ITPR for Subsea Equipment’s and Packaged Equipment

  • Over 82 Packaged Equipment and all Subsea Equipment
Design Verification

Performed design verification of over 200 process equipment that includes Pressure Vessels, Heat Exchanger, Storage Tanks, Road Tankers, Boilers etc. as per ASME Section VIII Div-1 and Div-2, DOSH Malaysia, SMPV(U) RULES,1981, TEMA, PD 5500, Indian Boiler Regulations Act etc.